Claim hygiene

No claim is promoted beyond its verified gate status. This public matrix was audited against the recovery authority on 26 September 2026.

Status Definitions

Exactly one label per scientific claim

LabelMeaning
Derived Checked calculation from declared assumptions in a stated domain
Conditional Requires a named postulate, matching hypothesis, or restricted limit
Open Defined calculation or test incomplete — default for untested routes
Rejected / Quarantined Stated derivation failed or its earlier packaging violated the evidence boundary

Key Quantities & Current Status

Canonical v12.0-alpha.12 authority baseline

Quantity / ComponentStatusCanonical Scope & Boundary
Conformal matter coupling (C_m) Research Fork Conformal Weyl trace fixes C_m = 1 inside the scale-compensator fork, but absolute parent-action matching remains underdetermined. This does not derive K_Q or V.
Matter vertex residue (V) Blocked V = C_m / sqrt(K_Q). The calibration f = 1/sqrt(4πG) is empirical, not derived from the parent action; K_Q is not derived and V is not computed.
Acceleration scale (a₀) Open The empirical MOND/AQUAL transition acceleration may be used only as a declared external input. The historical a₀ = cH₀/(2π) relation is not derived by ITSM.
SPARC catalogue performance Methods Only The repaired 152-galaxy comparator gives profiled raw χ²_ν = 10.86 for declared C=1 and 25.70 for historical C=2/3. Neither is an ITSM prediction; STAT-001 has not started as a closed gate.
Free moduli phase space (TOP-001) Scoped Negative Free Casimir stress dilutes toward spatial isotropy. The advertised driven state is not stationary for nonzero η; 13/12 requires η = 27/76 while the shape still drifts.
TOP-X4 / X4-S2F3 Local Parametrix Pass / Global State-Stress Hold The branchwise WKB state remains failed 11/12, exact finite-order transport passed 18/18, the D5 scaffold passed 20/20, and the fixed-metric scalar/chi operator passed 25/25. The local scalar-matrix Hadamard parametrix passes 22/22 through U_2, the theorem-backed scalar-state construction passes 10/10, and the scoped curved-Dirac operator passes 13/13. A global spinor state, counterterm normalization, curved graviton/ghost operators, parity phase, determinant, renormalized stress and physical Hessian remain incomplete. physics_pass=false and gate_effect=NONE.
Master Tests 1–3 / R4C1 Conditional The conditional R4C1 candidate has bounded action/source and variation receipts, while S1/S2/S3 add scalar constraint, corrected propagation and restricted zero-branch diagnostics. These results retain physics_pass=false; substantive stability, well-posedness, physical matching and canonical parent acceptance remain open.
BBN-001 action-derived interface Control Only / Upstream Blocked The table/CAMB controls and 12/12 bookkeeping contract are reproducible, but the physical early-plenum temperature map, Qμ, SN and action-derived Geff are missing. No ITSM BBN prediction is established.
Cosmological perturbations (COS-001 / PERT-001) Calibration / Open Unmodified CAMB ΛCDM reproduces its declared calibration inputs. A full ITSM Einstein–Boltzmann hierarchy, transfer functions and S₈ prediction remain open.